Policy Waste- Disposal- Hazardous Materials
Entegrated Waste Management System (GPRO-030- Zero Waste Procedure)
Policy Created: 2011
Policy Reviewed: 2023
PB-003- Sustainable Procurement Policy
TS EN ISO 9001:2015, Testing and Analysis Services; Certificate Validity Date16.01.2027
TS EN ISO 9001:2015, Dairy and Bakery Production; Certificate Validity Date16.01.2027
TS EN ISO 9001:2015, Higher Education Services; Certificate Validity Date16.01.2027
TS EN ISO 14001:2015, Certificate Validity Date 17.02.2027
Ege University Zero Waste management plan
Hazardous Waste Management policy
Operational directive - Hazardous Waste management policy
Ege University indoor waste management policy
Ege University Sustainable Green University Strategic Plan
Ege University, which was the first state university where the project was implemented as a pilot university
within the scope of the "Zero Waste" Project initiated by the Ministry of Environment and Urbanization, was
given a "Zero Waste Certificate" by the Izmir Provincial Directorate of Environment and Urbanization as a
result of the work carried out within the scope of the project. Ege University became the first educational
institution in Izmir to receive this certificate on a campus basis with all its units. Ege has met the following
criteria to receive a Zero Waste Certificate:
- At least binary collection of recyclable paper, glass, metal, plastic wastes separately from other wastes
-
Placement of storage equipment for glasses, textile/clothing wastes seperately in easily accessible
places for separate collection of wastes, - Establishment and start-up of Waste Collection Centers and collection points
-
Informing the public by determining the waste collection program, collecting the wastes within the
framework of the program -
Planning, informing and guiding different wastes such as batteries, vegetable waste oil, electrical
and electronic equipment waste, medicine waste, and bulky wastes to be brought to the Waste
Collection Center or collected from their place -
Carrying out the necessary studies for the recovery of biodegradable wastes by collecting them
separately (compost, biomethanization) -
Making awareness and awareness raising studies for the implementation of the system by
recording the data of the zero waste management system - Compliance with the provincial Zero Waste Management System Plan
Ege University Geen Universty Guide